Period executed |
Description of the work |
2003 |
Formation of Minor Irrigation Tank |
2004 |
Formation of new tank across local vagu near Gollpalli |
2004 |
Formation of new tank across local vagu at Govindareddypalli |
2004 |
Minor Irrigation special package works |
2005 |
Formation of new tank across Kushavathi River in Chittor Dt. |
2005 |
PWS Scheme to Pileru in Chittoor District |
2005 - Under execution |
Package No.101:- Investigation, design, estimation and execution of five (5) numbers reservoirs across at suitable valley portions and along the right main canal of Gudemdoddi Balancing Reservoir of Nettempadu Lift Irrigation Scheme in Mahabobnagar district comprising formation of earth dams with a total capacity of 2.0 TMC of water and construction and maintenance of regulators and surplus arrangements. |
2005 - Under execution |
Package No.108 :- Investigation, design, execution and 0045 ocution of two balancing Reservoirs at suitable valley positions along the right main canal under Reach - I and Reach - II of Relampadu Balancing Reservoir of Nettempadu Lift Irrigation Scheme in Mahaboobnagar District comprising formation of earth dams with a total capacity of 2.0 TMC of water and construction and maintenance of regulators and surplus arrangements etc. |
2005 |
Package No.5 :- Investigation, Design, Estimation and (1) Fabrication, Supply and fixing of 5 numbers radial gates of size 12.0 m x 11.00 m to the spillway regulator including primary and secondary embedded parts, laying secondary concrete, supply and fixing of cat walk bridge, gantry crane of 60 tonnes capacity, hoist arrangements, installation of generator of suitable capacity for operating the radial gates including motors, electrical fittings, construction of generator shed, and (2)Excavation of right main canal, left main canal,distributory system, field channels including construction of C.M & C.D works to feed an ayacut of 24,000 acres in Khariff and 2,000 acres in Rabi in 18 villages of Galiveedu, Lakkireddipalli and Ramapuram Mandals of Kadapa District including maintenance for Veligallu Reservoir Project for '2' years. |
2006 |
Formation of new tank across Chintalakona River in Chittor. |
2006 |
Formation of new tank across Nutikonavanka in kadapa Dt. |
2006 |
Formation of new tank across dosillavanka in Chittor Dt. |
2006 |
Excavation of feeder channel to feed chain of tanks in Chittor Dt. |
2006 |
Formation of new tank across Bhupateswarakona in Chittor. |
2006 |
Formation of new tank across Nutiguntakalva in Chittor Dt. |
2006 |
Formation of new tank across Rajuguntakalva in Chittor Dt. |
2006 |
Formation of new tank across Pedatalakona in Chittor Dt. |
2006 |
Formation of new tank across Gargeya river in Chittor Dt. |
2006 |
Modernization of Araniar Minor Irrigation project |
2006 to 2016 |
Package No.1,HNSS phase - II/1 Investigation, Preparation of HPs, designs, Excavation, Construction of CM & CD works of HNSS Main canal reach from km.216.300 to km 230.000, distributory system for an ayacut of 12,000 acres Khariff I.D. and approach channel from the foreshore of Jeedipalli reservoir to the off take of HNSS Phase II including construction of Head regulator cum off take at km.216.300 in Anantapur District. |
2007 |
Construction of drainage diversion wall at palamaner chervu |
2007 |
Formation of New tank at Gundodukanuma, Chittor Dt. |
2007 |
Comprehensive storm water drainage scheme for Rayachoti |
2007 |
Formation of new tank across Kunchamvarivanka, Chittor. |
2007 - Under execution |
Package No.11, HNSS Phase - II, Investigation, preparation of Hydroulic Particulars, design, Excavation, Construction of CM&CD works of HNSS Main canal reach from km 360.000 to km 380.000 Excluding Tunnel from km 360.000 to 360.400 and also for Distributory system for an ayacut of 12000 Acres Khariff ID under HNSS Phase-II, in Anantapur District. |
2007 - Under execution |
Package No.60/HNSS Phase II/ Investigation, Preparation of Hyderaulic Particulars, Designs & Drawings and Land Plan Schedules and Excavation of Punganur Branch Canal from km 160.000 to km 195.000 including Formation of summer storage tank near Guntavaripalli (V) to supply water to Madanapalli Municipality including of CM &CD works and Distributory system to feed an ayacut of 8500 A/C Kharief ID.
|
2007 - Under execution |
Package No.61/HNSS Phase II/ Investigation, Preparation of Hyderaulic Particulars, Designs & Drawings and Land Plan Schedules and Excavation of Punganur Branch Canal from km 195.000 to km 224.500 including Formation of summer storage tank near Guntavaripalli (V) to supply water to Madanapalli Municipality including of CM &CD works and Distributory system to feed an ayacut of 7500 A/C Kharief ID. |
2008 |
Restoration of breached Prasanna venkatasamudram tank near Ganugachinta Village in Rompicherla Mandal, Chittoor District. |
2008 |
Package No CTR-Piler -TFCBTR0607-7 (consisting of 2 works in PRSD, Piler). |
2008 |
Package No CTR- Piler-TFCBTR0708-13(consisting of 1 work in PRSD,Piler. |
2008 - Under execution |
Formation of new tank across Pedderu in Chittoor District. |
2008 |
Formation of new tank across Gajuleru in Chittoor District. |
2008 |
Construction of Barrage across Koundinya river Chittoor District for drinking water supply to Palamaner Town. |
2008 |
Formation of new tank across Talakona River in Chittoor District. |
2008 |
Excavation of flood flow channels to feed chain of tanks in Piler Constituency of Chittoor District. |
2008 |
Investigation, Preparation of Hydraulic Particulars, Designs and Drawings for Earth work Excavation of AVR HNSS Sodum Distributory from Km 0.000 to Km 43.200 including construction of CM & CD.works and Yarrathivaripalle distributory from Km 00.000 to Km 6.800 including Construction of CM & CD Works and Distributory System to feed an ayacut of 5,400 Acres under Khariff I.D. as per Annexure II and Investigation.
|
2008 |
Execution of Comprehensive Storm Water Drainage Scheme for Machilipatnam Municipality - under UIDSSMT Scheme.
|
2008 |
Madanapalli Municipality IHSDP Providing water supply, Roads, construction of Drains, 2 Nos. of community facilities centers, construction of Urban health center, providing of electrification and construction of compound wall in weaker section - Indiramma Housing Colony at B.K. Palli Village.
|
2009 |
Formation of new tank across Araniyar River near Thirurattam (v) in Narayanavanam (M), Chittoor District.
|
2009 |
Excavation of suply channel from Seekalakunta to Laddigam Cheruvu and Seekalakunta to Kagathi Cheruvu near Kagathi (v) in Chowdepalle (M) Chittoor District.
|
2009 - Under execution
|
Pranahitha - chevella Lift Irrigation Scheme Link - V, Package No.- 16. Investigation, design and execution of water conveyor system consisting of lined gravity canal of Tipparam - Chityal canal Reach - II. With carrying capacity of 33.20 cumecs from kandukur vagu south of M.Turkapalli Mandal to Kotlapur (v), of narayanpur Mandal of Nalgonda Dist, including formation of New Reservoir at Basvapoor (v), Bongiri (M), Nalgonda Dist. Enroute and construction of CM&cd works and distributory network for an ayacut of 1,65,500 Acres. Along with Consortium is under execution.
|
2009 - Under execution
|
Invistigation,preperation of Hydraulic particulars, Designs Drawings of Earth Work Excavation of AVR HNSS Sadum Distributory Canal Systems.
|
2009 |
Formation of new tank across Talakona River near O.S. Gollapalli H/o Yallamanda Village in Y.V.Palem (M) Chittoor District.
|
2009 - Under execution |
Excavation of Flood Flow Channel to feed chain of tanks in Piler constituence of Chittoor District.
|
2010 - Under execution
|
Formation of new tank across Araniyar River near Thiruvattam (V) in Narayanavanam (M), Chittoor District.
|
2010 |
Formation of Reservoir of 85.00 Mcft capatity across Peddavagu near Korlakuntavaripalle(v) H/o Timmanayanipalle (v) in Sodam (M) in Chittoor
District. |
2010 |
Excavation of Right Bank Canal of Rengali Irrigation Project from RD 86.5 to 89.5.
|
2010 |
Formation of new tank across Gajuleru River near Chellampalle (V) H/O Ganugachinta (V) in Rompicherla (M) Chittoor District. |
2010 |
Formation of new tank a/c Local vagu near Dabbalaguttapalle H/o Thamballapalle (V) & (M) ), Chittoor District.
|
2011 |
Construction of High Level Bridge on the road from Papireddy palli to Mudiyamvaripalli.
|
2011 |
Construction of Jambhira Earth Dam from Truncated to ultimate hight from RD 3930.00to 4960.00 in reach III.
|
2012 |
Improvements in Km 0/0 to 14/2 of Marripadu - Kadirayacheruvu road in Chittoor District.
|
2013 |
RRR of Pincha Anicut system near Nadigadda (V) in Sodum Mandal
|
2015 |
HNSS Project - Phase-II - Package No.57 (Balance Work) - Earth work excavation of Madakasira Branch canal in the reach from Km.157.000 to Km.158.000, and Km.168.000 to Km.169.000, and construction of CM & CD works on Madakasira Branch canal from Km 143.00
|
2015 |
HNSS Project - Phase-II - Package No.54 (Balance Work) - Earth work excavation of Madakasira Branch canal in the reach from Km.21.000 to Km.26.000, Km.41.000 to Km.42.000, Km45.000 to Km.49.000, km.54.000 to Km.55.000 and km.56.000 to km.57.000 and constr
|
2015 |
HNSS Project - Phase-II - Package 30 A - Balance work of Earth work Excavation of Neeva Branch Canal from km 32.000 to 74.000/81.200 including construction of CM & CD works in Chittoor District
|
2015 |
NABARD-RIDF-XX-Restoration of existing supply channel (Lakshmidevi kaluva) from Vyasasamudram tank and Improvements of tanks near Kandukur village in P.T.M Mandal of Chittor District
|
2015 |
Repairs to Gangalapaeru check dam near Nulukunta (V) in Kuppam Mandal of chittor district
|
2016 |
PALAMURU-RANGAREDDY Lift Irrigation Scheme - (pakage no.13)- Formation of Earthen Embankment of Kurumurthiraya Reseviour from K.m. 0.00 to K.m. 4.50 near Karvena (V), Boothpur (M), Mahabubnagar (D).
|
2016 |
PALAMURU-RANGAREDDY Lift Irrigation Scheme - PRLIS - (pakage no.2)- Formation of Anjanagiri Reserviour at Narlapur (V), Kollapur (M), Mahabubnagar (D).
|
2017 |
TDWSP, RANGA REDDY - NCC Providing Drinking water to Chevella, Vikarabad, Parigi, Tandur and Maheswaram Constituencies in Ranga Reddy from Srisailam Reservoir including operation and maintenance for 10 Years un der Telangana Drinking Water Supply Project (TDWSP)
|
2017 |
TDWSP - ADILABAD - Providing drinking water to habitations in Yellampalli, Mancherial and Chennur Providing drinking water to Khanapur constitutency (Khanapur, Kadem and JinnaramMandals) in Adilabaddist including operation and maintenance for 10 years
|
2017 |
KALESHWARAM PROJECT - Formation of Baswapur Reservoir for a capacity of 11.39 TMC near Baswapur(V), Bhongir(M), Yadadri-Bhongir District and Execution of High level Main canal including Distributary system, CM & CD works to create an ayacut of 23,000Ac
|
2018 |
Formation of Konda Pocahamma sagar for a capacity of 11.39 TMC near Baswapur(V), Bhongir(M), Yadadri-Bhongir District and Execution of High level Main canal including Distributary system, CM & CD works to create an ayacut of 23,000Ac
|