RAILWAY PROJECTS
ARISIKERE-BIRUR
Patch doubling works for a length of 25 KM including P way linking is under execution.
SOUTH CENTRAL RAILWAY AT VASCO, BIJAPUR, KURNOOL AND BELGAM
Gauge conversion works between Dharmavaram and Pakala railway line is completed.
DHARMAVARAM PAKALA
section conversion of track from MG to BG- Construction of Minor Bridges and formation of Earth work, between Madana palli road and Thummangunta Stations ( reach-I).
DHARMAVARAM PAKALA
Conversion of Track from MG to BG of Dharmavaram Pakala section making up deficiencies in earth work in formation, filling rain cuts, pitching, flooring, barricades, Ballast formation of approaches and any other works, between Pakala & Piler stations in connection with CRF infection.
KOSIGI - MANTRALAYAM
Proposed Construction of pipe line bridge 1009A as 2 x 4.00 x 3.00(clear height of vent way) precast/cast-in-situ RCC Box by box pushing method/Cast-in-situ at Railway K.m. 526/5-6 between Kosigi - Mantralayam road station(Deposit work) Guru Raghaven.
TIRUPATHI-KATPADI SECTION
Proposed construction of road under Bridge No.615A (Sub Way)of size 1x4.00x4.50m RCC Box in lieu of LC No.11 (Unmanned)at K.m.48/3-4 between Pakala - Puthalapattu section by cut and cover method. SW - II Dharmavaram - Pakala section - proposed construction of road under bridge No.778A(Sub Way of size 1x4.00x4.50 m RCC Box lie of LC No.117 un manned)at K.m. 182/8-9 between Kalikiri-Piler section by cut cover method.
S.W. 1) Proposed New Bridge RCC box (2.5m x 2.3 M twin Boxes, skew) in lieu of Bridge No.06 for Conveyance of drainage water (Sewage) in Vijayawada yard at K.M. 429/23-19 Between Rayanapadu and Vijayawada Stations. SW II Proposed New Bridge RCC box (2.5 x 2.0 M Twin Boxes, skew) in lie of bridge No. GI (3x1.20m RP) for conveyance of drainage water crossing bulb line tracks in Vijayawada at K.M. 0/18-16 existing track man rest room in connection with propsed RCC box in lieu of Br.NO.6 for conveyance of drainage water in Vijayawada yard at K.M. 429/23-19 2) Vijayawada - Visakhapatnam section - Proposed construction of road under bridge of size 1x4.00 MM x 2.50 at K.M. 431/8-10A on Vijayawada - Visakhapatnam section near singh Nagar Fly over, Ramakrishnapuram Vijayawada.
KRY-PIL: Proposed construction of Canal Bridge No.775-A as 2X4.00X4.00m (clear Height of vent way) precast RCC Box by Box pushing method at km 183.50 bet DMM-PAK stations (Deposit work) AVR HNSS Project - Punganur Branch Canal.
PACKAGE NO.2 Execution of Civil & P. Way work of Phase-II from Km 16/525 to 22/000 in connection with construction of Balance work of Piparwar Railway Siding at Piparwar of CCL, Dist. Chatra, Jharkhand.
PACKAGE NO.3 Execution of Civil & P. Way work of Phase-II from Execution of Civil & P. Way work from Km. 22/000 to Km. 26/160 in connection with construction of Balance work of Piparwar Railway Siding at Piparwar of CCL, Dist. Chatra, Jharkhand.
PACKAGE NO.5 Supply & Delivery of Railway track Ballast in between Damodar bridge to Piparwar siding (Phase-II area) in connection with 'Construction of Railway Infrastructure for CCL at Piparwar, Dist. Chatra, Jharkhand.
Guntakal Division - Yerraguntla - Nossam New B.G. Line :- Elimination of fifteen numbers of Un manned level crossings between YA- NOSM by construction of Road under Bridges by opne cut method.
Secundrerabad Division - Kazipet - Balharshah section - Proposed Third line between Balharshah Kazipet stations - Execution of Eart Work in embankment & cutting, balancing to the standards of GE.14, construction of minor bridges and execution of Miscellaneous work (excluding Major Bridges) including clearing the S&T obstructions from Ch. 172000 to 203000 Between Makudi (incl) - sirour Kaghaznagar (incl) stations (Reach-V).